A transformer substation is a piece of equipment that rewards routine.
When it is maintained regularly, it can operate for decades without drama and without attracting attention. When it is neglected, it makes its presence known at the worst possible moment, through an outage that brings the entire facility to a standstill.


Ownership of a transformer substation therefore does not end when construction is completed. That is when the responsibility actually begins.


The owner of an electrical power installation is required to keep it in a safe and operational condition. In practice, this means carrying out periodic inspections and testing in accordance with applicable regulations and equipment manufacturers’ instructions, maintaining proper records and correcting any identified deficiencies.
This is not merely an administrative formality. Inspection and testing records are among the first documents requested after any incident, both by insurance companies and by regulatory authorities.
A regular maintenance programme covers several areas.


Visual inspections should be carried out at shorter intervals and should include the condition of the room, signs of moisture, unusual noise or smells, and instrument readings.


Thermal imaging under load can identify loose connections and overheating before they develop into failures.
For oil-immersed transformers, the condition of the oil should be monitored because the oil can reveal the entire operating history of the transformer.


Protection relays should be tested and trip functions verified, because a protection system that has never been tested is one whose operation is merely assumed.


Grounding resistance must also be measured.


Cleaning, tightening of electrical connections and servicing of circuit-breaker mechanisms should be carried out at longer intervals, in accordance with the manufacturer’s recommendations.
Work on medium-voltage installations is not a task for a general maintenance worker, regardless of how capable or resourceful that person may be.


Inspections and testing must be performed by properly trained and authorised personnel, using the prescribed equipment and following procedures applicable to work on electrical power installations.
For most companies, this effectively means entering into a maintenance agreement with a specialised service provider. The agreement should clearly define the scope of work, inspection intervals and response times for emergency interventions.

The cost of such an agreement is generally lower than the cost of a single hour of production downtime.
Failure statistics for transformer substations are remarkably consistent. A large proportion of outages are caused by issues that regular inspections would have detected: a loose connection, deteriorated insulation or protection settings that have been incorrect since commissioning.


Annual preventive maintenance typically costs only a fraction of the value of the equipment it protects, while transformer failure can result in weeks or even months of waiting for a replacement.


There are few areas in industry where the relationship between the amount invested and the value protected is so clear, and yet so frequently ignored.

A Transformer Substation for a Solar Power Plant Is Not the Same as One Designed for Consumption

At first glance, a transformer substation is simply a transformer substation: a transformer, medium-voltage switchgear and distribution equipment.

What Happens When a Transformer Fails?

Transformer failure is not something companies like to think about because it is relatively rare.

One Large Transformer or Two Smaller Ones

When designing a transformer substation for a larger industrial facility, a question eventually arises that may seem like a minor detail but actually determines the facility’s reliability for the next thirty years: should the system use one transformer with the full required capacity, or two smaller transformers that provide the same combined capacity?

Transformer Losses: A Cost That Runs 24 Hours a Day

A transformer is one of the most efficient machines ever created, with an efficiency that exceeds 98 percent.

Guide to Connecting to the Medium-Voltage Grid

Connecting a facility to the medium-voltage grid is a procedure with clearly defined steps, but there are also enough points where a project can lose several months if those steps are carried out in the wrong order.

Dry-Type or Oil-Immersed Transformer

When selecting a power transformer, one question arises in almost every project: dry-type or oil-immersed?

Your Own Transformer Substation or a Connection Through a Third-Party Substation

Many companies operate for years connected to the low-voltage network through a distribution transformer substation. They only begin considering their own substation when the distribution system operator informs them that no additional capacity is available for a planned expansion.

Transitioning the Grid from 10 kV to 20 kV: What It Means for Your Equipment

For decades, Serbia’s distribution network has operated with two medium-voltage levels: 10 kV and 20 kV.

Learn more

Enter your information to receive more information on the selected topic

Planiraj svoju elektranu

Odgovorite na pitanja ispod kako bi naš inženjerski tim mogao da uradi studiju izvodljivosti nakon koje će vas kontaktirati.

Nakon dostavljanja podataka, naš stručni tim će analizirati Vaš zahtev i pripremiti personalizovanu ponudu sa predlogom optimalnog solarnog sistema za Vaš objekat. Kontaktiraćemo Vas kako bismo predstavili predloženo tehničko rešenje, očekivanu proizvodnju električne energije i odgovorili na sva Vaša pitanja u vezi sa realizacijom projekta.

Solarna elektrana omogućava dugoročno smanjenje troškova električne energije, veću energetsku nezavisnost domaćinstva i doprinosi očuvanju životne sredine korišćenjem energije iz obnovljivih izvora.

Planiraj svoju elektranu

Odgovorite na pitanja ispod kako bi naš inženjerski tim mogao da uradi studiju izvodljivosti nakon koje će vas kontaktirati.

Nakon dostavljenih podataka za izradu studije izvodljivosti, i kada naš inženjerski tim uradi studiju izvodljivosti, predlažemo da organizujemo sastanak gde bismo Vam prezentovali studiju. Takođe, tom prilikom ćemo detaljnije pričati o samoj investiciji i benefitima ulaganja u obnovljive izvore energije, kao i o mogćim otpisima putem dostupnih fondova (IPARD, RAS, EBRD).  

Pored uštede električne energije, solarnom elektranom možete generisati i dodatne benefite kao što su direktran uticaj na smanjenje emsije CO2 što može direktno uticati na konkurentnost prilikom izvoza na tržištu EU, kao i dodatne benefite uštede hlađenja.

Planiraj svoju elektranu

Izaberite tip objekta za koji želite da planirate solarnu elektranu